We have had all kinds of weather this week to test the teams character. At the start of the week it was mild but raining, despite this the bricklayers worked on and progressed with the brickwork which is now up to the eaves. The plaster boarding and building of partition walls commenced in the flats upstairs and the joiner followed on fixing the door frames and window boards.
Towards the end of the week the weather took a turn for the worse and the temperature dropped below zero therefore restricting the bricklayers to do any work on the superstructure. As we are a member of the Considerate Constructors Scheme the team showed some Christmas spirit by de-icing local residents cars with them and gritting the road that runs parallel with the project whilst they were waiting for the temperature to rise.